This stainless steel fabrication project was done for Leidy’s Meats in Souderton PA.
I do welding for Leidy’s pretty regularly. The other day, I they were looking to have a part to one of their machines replaced, but the machine is no longer manufactured. Leidy’s got a price for just a new shaft that was quite high, and there would be no telling when they would get the part. They asked me if I could fabricate one of the shafts. I gave them a price to design, fabricate, weld, and install the new stainless steel part, shaft and all. I will be installing the new stainless steel part tomorrow if all go well.
Design, Fabrication and Welding Time
Total time to design and fabricate the machine part was 1 day. The installation might add a bit of time to the total project time.
Stainless Steel was the material that was used for the fabrication.